Al-Ghassani, A M, Kamara, J M, Anumba, C J and Carrillo, P M (2006) Prototype System for Knowledge Problem Definition. Journal of Construction Engineering and Management, 132(05), 516–24.

Baradan, S and Usmen, M A (2006) Comparative Injury and Fatality Risk Analysis of Building Trades. Journal of Construction Engineering and Management, 132(05), 533–9.

Chan, E H, Suen, H C and Chan, C K (2006) MAUT-Based Dispute Resolution Selection Model Prototype for International Construction Projects. Journal of Construction Engineering and Management, 132(05), 444–51.

  • Type: Journal Article
  • Keywords: Construction companies; Dispute resolution; International factors; Construction industry;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2006)132:5(444)
  • Abstract:
    Disputes are common in international projects because of contractual, cultural, and legal factors. The dispute resolution methods currently adopted in international projects are varying, including litigation, arbitration, adjudication, mediation, expert-determination, dispute resolution board, and minitrial. The problem in question is on how to select the most appropriate resolution method that can fit nicely in the nature of the dispute and the disputing parties’ needs. A dispute resolution selection prototype (Model) based on the analytical hierarchy process and multiattribute utility technique (MAUT) is presented in this paper. The Model developed consists of five components: Selection factors, dispute resolution methods, utility factors, relative importance weightings, and user’s preferred weightings. These were based on the quantitative data provided by 41 experts in the field, who were barristers, arbitrators, mediators, and project managers. The Model is considered beneficial to the industry, as it provides construction professionals with a systematic and objective approach in the management of international project disputes.

El-Mashaleh, M, O’Brien, W J and Minchin, R E (2006) Firm Performance and Information Technology Utilization in the Construction Industry. Journal of Construction Engineering and Management, 132(05), 499–507.

Garcia, C, Huebschman, R, Abraham, D M and Bullock, D M (2006) Using GPS to Measure the Impact of Construction Activities on Rural Interstates. Journal of Construction Engineering and Management, 132(05), 508–15.

Hyari, K and El-Rayes, K (2006) Lighting Requirements for Nighttime Highway Construction. Journal of Construction Engineering and Management, 132(05), 435–43.

Kandil, A and El-Rayes, K (2006) Parallel Genetic Algorithms for Optimizing Resource Utilization in Large-Scale Construction Projects. Journal of Construction Engineering and Management, 132(05), 491–8.

Lee, E, Lee, H and Harvey, J T (2006) Fast-Track Urban Freeway Rehabilitation with 55-H Weekend Closures: I-710 Long Beach Case Study. Journal of Construction Engineering and Management, 132(05), 465–72.

Lee, S, Peña-Mora, F and Park, M (2006) Reliability and Stability Buffering Approach: Focusing on the Issues of Errors and Changes in Concurrent Design and Construction Projects. Journal of Construction Engineering and Management, 132(05), 452–64.

Uma Maheswari, J, Varghese, K and Sridharan, T (2006) Application of Dependency Structure Matrix for Activity Sequencing in Concurrent Engineering Projects. Journal of Construction Engineering and Management, 132(05), 482–90.

Uwakweh, B O (2006) Motivational Climate of Construction Apprentice. Journal of Construction Engineering and Management, 132(05), 525–32.

Winch, G M and North, S (2006) Critical Space Analysis. Journal of Construction Engineering and Management, 132(05), 473–81.